Skip to content
Factory-direct FRP grating & access systems · Nanjing, China njlf.frp@gmail.com  |  +86 25 8491 0966
JINGLUE
FRP Grating Systems
Standards & Testing · 2025-09-26

EN ISO 14122 & OSHA Handrail and Ladder Requirements for FRP Systems

Grating is the deck; handrail and ladders are the specified system around it. Two standards families govern the geometry.

EN ISO 14122 — the European machine-access standard

ElementRequirement (typical)
Handrail height≥ 1 100 mm above walking surface
Kick plate≥ 100 mm, gap to deck ≤ 10 mm
Rail loads1.5 kN point load at top rail; 0.6 kN/m line load (verify current edition)
Fixed ladder rungs225–300 mm spacing, ≥ 400 mm clear width
Ladder cageFrom 2.2 m above grade; rest platform every ≤ 6 m
Ladder loads1.5 kN single point; 2 × 0.75 kN distributed on rungs

OSHA 1910.29 / 1910.28 — the US family

Top rail height 42 in (± 3 in), mid-rail at half that, toe boards where falling-object risk exists, 200 lb (0.89 kN) top-rail load capacity; fixed ladders over 24 ft require cage, well or personal fall-arrest per the phased rules. JINGLUE's handrail geometry is adjustable to either family — the profiles are the same, the spacing and heights are set per your project's governing standard.

Why FRP changes nothing and everything

Structurally the loads are identical — pultruded FRP tubes carry 1.5 kN point loads with the same section logic as steel. What changes: no earthing or bonding detail, no paint system on the rails, no rust streaks, and no hot-work for modifications. The compliance conversation becomes purely geometric — which is the easy part.

Get a Grating Selection and Price Within One Working Day

Send your span, loading and chemical environment — or a panel schedule — and we will confirm depth, resin and fixing detail with a factory-direct quote.

Request a Quote