Skip to content
Factory-direct FRP grating & access systems · Nanjing, China njlf.frp@gmail.com  |  +86 25 8491 0966
JINGLUE
FRP Grating Systems
Comparison

FRP vs Steel vs Aluminum Grating

The honest version: steel wins on first cost and fire, aluminum wins on weight per dollar, FRP wins everywhere your deck gets wet, chemical or salty. Here are the numbers.

PropertyFRP (vinyl ester)Hot-dip galvanized steelAluminum
Corrosion in chemical / salt serviceImmune — barrier is full thicknessCoating fails in 3–5 yrs, then rusts fastPits in chloride environments
Weight at comparable duty~19 kg/m²~30–35 kg/m² (open bar)~12 kg/m²
Stiffness (deflection at 1 m, same load)ModerateHighestModerate
Electrical conductivityNone — non-conductiveConductiveConductive
Spark from dropped toolsNoneYesYes
MagneticNoYesNo
Fire performanceClass 1 (VE / phenolic)Non-combustible (loses strength hot)Non-combustible (softens ~200 °C)
Cutting on siteHand tools, no edge sealing (molded)Welding / grinding, touch-up galvanizingCuts easily, edges sharp
Maintenance cycleNoneInspection + recoat / replaceInspection; cleaning in marine air

20-year installed cost, 100 m² corrosive-area walkway (indicative model)

Cost itemFRP (VE)Galvanized steelAluminum
Material + install (year 0)1.30 × steel base1.00 (base)1.10
Recoat / touch-up cycles (yrs 5, 10, 15)00.450.15
Partial replacement (yrs 8–12)00.800.10
Access / shutdown premium per maintenance event00.350.15
20-year total1.302.601.50

Model assumes corrosive service (chemical splash, wastewater H₂S or marine salt). In a dry, non-corrosive interior, galvanized steel remains the rational first choice — we will tell you so. Multipliers are indicative; send your walkway area and environment for a project-specific comparison.

The one-line version for your approval memo

FRP costs about 30% more on day one and roughly half as much over twenty years in corrosive service — and it eliminates the repaint shutdowns that drive the difference.

Get a Grating Selection and Price Within One Working Day

Send your span, loading and chemical environment — or a panel schedule — and we will confirm depth, resin and fixing detail with a factory-direct quote.

Request a Quote